Generator - Northern Lights M944W3 12 kW
S/N NL944-77120
📍Engine room, port
Hours6,875 h (16 Nov 2026)
Avg use2.7 h/day
Notes
How it works
Check oil and coolant before start, raw-water seacock open. Start, confirm exhaust water, let it warm before applying load. Remove load and run 3-5 min before stopping.
Known issues
Shuts down on high temp: raw-water flow (impeller, strainer, seacock).
Won't start: fuel, glow plugs, start battery, or a safety shutdown (low oil/high temp) - check the panel fault code.
Running light for long periods causes wet stacking - give it load.
Planned maintenance
| Status | Task | Next due | |
|---|---|---|---|
| Overdue | Change generator oil and filter
33 days overdue / 12 h overdue |
23 Oct 2026 at 6,863 h |
|
| Due soon | Replace generator anodes
in 2 days |
27 Nov 2026 | |
| OK | Inspect generator belts
in 118 days / in 226 h |
23 Mar 2027 at 7,101 h |
|
| OK | Replace generator fuel filters
in 254 days / in 303 h |
06 Aug 2027 at 7,178 h |
|
| OK | Replace generator raw-water impeller
in 196 days / in 861 h |
09 Jun 2027 at 7,736 h |
|
| OK | Replace generator coolant
in 436 days / in 1,411 h |
04 Feb 2028 at 8,286 h |
|
| OK | Generator full service by technician
in 575 days |
22 Jun 2028 |
Unplanned maintenance
| Nothing unplanned recorded. |
Service history
| 14 Nov 2026 | Replaced leaking exhaust elbow gasket Weep at elbow flange found on daily round. Replaced gasket, torqued, ran 1 h under load - dry. |
Jamie Cole |
| 06 Aug 2026 6,678 h |
Replace generator fuel filters Completed as per procedure. |
Priya Shah |
| 23 Jun 2026 | Generator full service by technician Completed as per procedure. |
Priya Shah |
| 09 Jun 2026 6,736 h |
Replace generator raw-water impeller Completed as per procedure. |
Jamie Cole |
| 31 May 2026 | Replace generator anodes Completed as per procedure. |
Sam Taylor |
| 23 Mar 2026 6,601 h |
Inspect generator belts Completed as per procedure. |
Sam Taylor |
| 04 Feb 2026 6,286 h |
Replace generator coolant Completed as per procedure. |
Priya Shah |
| 23 Oct 2025 6,613 h |
Change generator oil and filter Completed as per procedure. |
Priya Shah |
Diagrams, plans & photos
Diagrams & plans · 1
Hour meter readings
| 10 Nov 2026 | 6,855 h | Jamie Cole |
| 03 Nov 2026 | 6,825 h | Jamie Cole |
| 27 Oct 2026 | 6,815 h | Jamie Cole |
| 20 Oct 2026 | 6,751 h | Jamie Cole |
| 13 Oct 2026 | 6,720 h | Jamie Cole |
| 06 Oct 2026 | 6,755 h | Jamie Cole |
| 29 Sep 2026 | 6,742 h | Jamie Cole |
| 22 Sep 2026 | 6,683 h | Jamie Cole |
| 15 Sep 2026 | 6,569 h | Jamie Cole |
| 08 Sep 2026 | 6,685 h | Jamie Cole |
Fluids & capacities
| Coolant | ||
| Engine oil |
Inventory
| Fuel filter, secondary 24-14102 · ER port locker 2, bin B |
3 pcs (min 2) |
| Oil filter 24-15016 · ER port locker 2, bin A |
4 pcs (min 3) |
| Raw-water impeller kit 24-21011 · ER port locker 2, bin A |
1 pcs (min 2) |
| Zinc anode, heat exchanger 24-23100 · ER port locker 2, bin C |
0 pcs (min 4) |
Manuals & files
Generator 12 kW - operation and service manual Manual · 8 p.
Generator AC output and changeover Wiring diagram · 1 p.
Components & parts 8 components · 4 parts
Raw-water pump impeller 24-21011 · 0 parts
Impeller kit